• [Oral Presentation]Rope-free lifting and pipeline transportation technology for deep ground resource fluidized mining system
    00
    days
    00
    hours
    00
    minutes
    00
    seconds
    00
    days
    00
    hours
    00
    minutes
    00
    seconds

    [Oral Presentation]Rope-free lifting and pipeline transportation technology for deep ground resource fluidized mining system

    Rope-free lifting and pipeline transportation technology for deep ground resource fluidized mining system
    ID:440 Submission ID:172 View Protection:ATTENDEE Updated Time:2024-05-16 20:10:36 Hits:148 Oral Presentation

    Start Time:2024-05-30 21:00 (Asia/Shanghai)

    Duration:10min

    Session:[S3] Deep Underground Engineering and Energy Utilization ? [S3-3] Evening of May 30th

    No files

    Abstract
    How to achieve the improvement and transportation of deep mineral resources has become an urgent issue to be solved in ultra-deep well engineering. Therefore, this paper proposes a main-auxiliary collaborative transportation system for deep ground fluidized mining. Of this, the main transportation system, which is based on the theory of solid-liquid two-phase flow and multi-stage pump technology, adopts an ore slurry pipeline vertical transportation system to transport the fluidized mineral resources to the ground. The auxiliary transportation system, which uses a linear motor and gear-rack composite lifting method, adopts a rope-free lifting system to achieve back-and-forth transportation of personnel, equipment, and materials. Based on this, the paper identifies important fundamental theories and key technical issues that need to be urgently addressed and researched in the construction of deep ground ore slurry pipeline transportation systems and ultra-deep well rope-free lifting systems. To address and research these issues, it developed a vertical ore pulp pipeline test system, reaching a height of up to 43 meters, and a linear motor and gear-rack composite lifting test system. Then, research was conducted on the measures for wear reduction in vertical fluidization pipelines and the control strategy for composite rope-free lifting system. This lays a theoretical and experimental foundation for the breakthrough of rope-free lifting and pipeline transportation technologies, which are urgently required for the development of deep ground resources fluidized mining.
    Keywords
    Deep ground mining,Mineral resource,Rope-free lifting,Pipeline transportation,Linear motor,Gear-rack system
    Speaker
    Shaodi Zhao
    China University of Mining and Technology

    Submission Author
    玥鋒 李 中國礦業大學
    妍 陰 中國礦業大學
    Jiusheng BAO China University of Mining and Technology
    世榮 葛 中國礦業大學(北京)
    少迪 趙 中國礦業大學
    忠賓 王 中國礦業大學
    Zhengyi Jiang University of Wollongong
    Comment submit
    Verification code Change another
    All comments

    Contact us

    Abstract and Paper:Ms. Zhang
    Tel:(0086)-516-83995113
    General Affairs:Ms. Zhang
    Tel:(0086)-516-83590258
    Hotel Services:Ms. ZHANG
    Tel:15852197548
    Sponsorship and Exhibition:Mr. Li
    Tel:(0086)-516-83590246
    Log in Registration Submit Abstract Hotel
  • 成人视频